| Industry Sector | Wet Cake Feed | Inlet → Outlet Moisture | Heating & MOC | Disposal Reduction & Payback |
|---|---|---|---|---|
| Pharma API & ZLD Plant (Gujarat) | 6,500 kg/day filter cake | 82% → 8% dry powder | Steam (6 kg/cm²) · Duplex 2205 | 80.4% weight cut · ~11 months ROI |
| Textile Dyeing CETP (Surat / Ahmedabad) | 14,000 kg/day mixed sludge | 78% → 12% granules | Thermic Fluid (240°C) · SS 316L | 75.0% weight cut · ~13 months ROI |
| Specialty Chemical & Pigments | 4,200 kg/day chemical cake | 79% → 10% dry solids | Steam (7 kg/cm²) · SS 316L | 76.7% weight cut · ~12 months ROI |
| Kraft Paper & Distillery Bio-Sludge | 18,000 kg/day biological cake | 81% → 15% fuel solids | Boiler Bleed Steam · SS 304 | 77.6% weight cut · Reused as boiler fuel |
| Municipal STP Centrifuge Cake | 10,000 kg/day digested cake | 77% → 10% pasteurized solids | Thermic Oil · SS 304 | 74.4% weight cut · Odor-free RDF output |
High-Chloride MEE/ATFD & Filter Press Cake
Challenge: Corrosive high-TDS salts pitted carbon-steel surfaces while heavy TSDF tariffs eroded margins on 6.5 TPD wet cake.
AS Engineers Solution: Twin-shaft Duplex 2205 Hollow Paddle Dryer with closed condenser and caustic wet scrubber. Reduced cake from 82% to 8% moisture cleanly with zero fugitive solvent odor.
Gelatinous Sticky-Phase Bio-Chemical Cake
Challenge: Conventional air dryers balled up sticky textile sludge around 50% moisture, causing frequent unscheduled shutdowns.
AS Engineers Solution: Intermeshing wedge hollow paddles heated via thermic fluid continuously wiped adjacent surfaces through the paste transition zone, cutting daily disposal load from 14 MT to 3.5 MT.
Request an ROI & Sizing Analysis for Your Sludge